Fluor Canada Ltd.
Bridging North America (BNA), a partnership of Fluor, ACS Infrastructure Canada and Aecon Group Inc., is seeking candidates for the Gordie Howe International Bridge project. BNA was selected to design, build, finance, operate and maintain the CAD$5.7 billion (approximate US$4.4 billion) Gordie Howe International Bridge project for Windsor-Detroit Bridge Authority (WDBA). When completed, the bridge will be the longest cable-stayed bridge in North America. The project includes a bridge and border crossing spanning the Detroit River and connecting Detroit, Michigan, U.S., and Windsor, Ontario, Canada, by linking Interstate 75 and Interstate 96 in Michigan with the new extension of Highway 401 (Rt. Hon. Herb Gray Parkway) in Ontario. The scope also includes building new, state-of-the-art ports of entry on both the U.S. and Canadian sides of the Detroit River as well as improvements to existing infrastructure in both Michigan and Ontario. This position produces a variety of regular and ad-hoc reports in support of our project planning and control initiatives. Works closely with all functional departments, the Planner/Scheduler plays a key role in ensuring that BNA policies, procedures, and standards are adhered to.
View Job